IF NOT HYDROGEN, CAN BATTERIES?

Rail electrification in Australia is largely confined to the major cities, and elsewhere most trains are powered by diesel. As Australia has now legislated the target of zero CO2 emissions […]

AUTOMATING 3D ROLLINGSTOCK CLEARANCE OUTLINES

The calculation of rollingstock clearances is critical to the transit-space design of any rail project and is used for multidisciplinary clash detection and within drawing deliverables. This traditionally manual process […]

ARE HYBRIDS JUST HYPE?

This paper attempts to quantify the fuel savings and emission reductions which could be expected on longdistance rail passenger routes in Australia using a diesel hybrid with regenerative braking and […]

WHY CHANGE AS7524 COUPLERS AND DRAW GEAR?

The Coupler and Draw gear standard AS7524:2019 [1] contains new requirements that have previously not been considered. The principal new consideration is that of jack knifing derailment from coupler lateral […]

MANAGING THE MOCK-UP

This paper covers the types and uses of mock-ups (full size models or replicas) in the design and construction of rolling stock. It focuses on the planning and considerations required […]

Scroll to top