BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.18.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Melbourne
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20180331T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20181006T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20190406T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20191005T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20200404T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20201003T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Melbourne:20191022T173000
DTEND;TZID=Australia/Melbourne:20191022T193000
DTSTAMP:20191020T113340Z
CREATED:20191020T112643Z
LAST-MODIFIED:20191020T113340Z
UID:1798-1571765400-1571772600@www.rtsa.com.au
SUMMARY:NSW Event - Innovative Design and Construction for new Grafton Bridge Structures
DESCRIPTION:The Bridge over the Clarence River Project in Grafton\, NSW is nearing completion. The project comprises two complex bridge structures\, namely: \n\nNew Bridge over the Clarence River – a new 525 m long precast match cast segmental balanced cantilever bridge with 74 m spans\nA new rail bridge comprising a steel truss on a 47-degree skew to replace an older three-span reinforced concrete bridge\n\nThe seminar will present the innovative design and construction methods used for each bridge including a novel approach to segment erection\, the use of four integral river piers and a heavily skewed steel through-truss. \nSpeakers: \nKen O’Neill leads Aurecon’s NSW bridges team and is a member of the Engineers Australia Civil and Structural Panel in Sydney. He has over 20 years’ experience in the design and construction of major infrastructure projects\, particularly specialising in bridge construction. Ken was Aurecon’s design manager for the project from tender design right through to construction. \nBrian Killeen is an Associate within Aurecon’s Sydney Bridge team and has over ten years’ experience in bridge design. He has worked on numerous projects in both Europe and Australia.  Brian was the bridge design leader for the match cast segmental bridge over the Clarence River. \n(This is not a RTSA event but an EA event hosted by the Civil and Structural Panel) \nClick on the link below to register (fee may be applicable if not an EA Member). \n 
URL:https://www.rtsa.com.au/events/nsw-event-innovative-design-and-construction-for-new-grafton-bridge-structures/
LOCATION:Venue Zenith Theatre\, McIntosh Street and Railway Street\, Chatswood\, NSW\, Australia
CATEGORIES:New South Wales and ACT Events
END:VEVENT
END:VCALENDAR