BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.18.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Melbourne
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20180331T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20181006T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20190406T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20191005T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20200404T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20201003T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Melbourne:20191030T173000
DTEND;TZID=Australia/Melbourne:20191030T193000
DTSTAMP:20190903T025954Z
CREATED:20190903T023616Z
LAST-MODIFIED:20190903T025954Z
UID:1595-1572456600-1572463800@www.rtsa.com.au
SUMMARY:SA Event - Structures on the Oaklands Rail Crossing Project
DESCRIPTION:Oaklands Rail Crossing was designed and constructed by the Public Transport Projects Alliance which consists of McConnell Dowell\, Arup\, Mott MacDonald and the Department of Planning\, Transport and Infrastructure (DPTI). The project involved the grade separation of the Seaford rail line from the Morphett Road/ Diagonal Road intersection located in the South West of Adelaide. \nThe design solution was to lower the Seaford rail line underneath Morphett Road with a top down construction approach. To minimise disruption to the community\, the new section of railway and the new Oaklands station were largely constructed offline. Through close collaboration between the design and construction teams\, the rail closure was limited to 24 days\, during which time the new rail was tied into the existing and the station commissioned\, prior to being re-opened for public use. \nThis presentation will provide an overview of the structures on the project\, including discussion of the key design and construction challenges that were faced by the PTP Alliance. \nNote: This is not a RTSA Event but an EA event hosted by Engineers Australia Structural Branch (SA Chapter).
URL:https://www.rtsa.com.au/events/sa-event-structures-on-the-oaklands-rail-crossing-project/
LOCATION:Engineers Australia South Australia\, 108 King William Street\, Level 11\, Adelaide\, South Australia\, 5000\, Australia
CATEGORIES:South Australia Events
END:VEVENT
END:VCALENDAR