BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.18.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Pacific/Auckland
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20190406T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20190928T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20200404T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20200926T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20210403T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20210925T140000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Pacific/Auckland:20200617T123000
DTEND;TZID=Pacific/Auckland:20200617T133000
DTSTAMP:20200604T074839Z
CREATED:20200604T074839Z
LAST-MODIFIED:20200604T074839Z
UID:2247-1592397000-1592400600@www.rtsa.com.au
SUMMARY:RTSA NZ Chapter Event (Webinar) - symbiosis between Safety and Requirements Management on the Auckland City Rail Link project. on the City Rail Link project
DESCRIPTION:Join us for our next online webinar\, The symbiosis between Safety and Requirements Management on the City Rail Link project. \nThe design team started Safety in Design workshops during definition design\, with regular updates all through concept design and detailed design. Hazards were identified\, mitigations were proposed and evaluated according to the hierarchy of controls\, with elimination being the primary goal. Accepted mitigations were captured in the SiD register and implemented in the design. The requirements team sat in the other side of the office\, furiously wrote thick documents containing weirdly-worded requirements and made untimely requests for design compliance. The beautiful design was handed over to construction\, who implemented most of it. A few minor changes were made\, mainly value engineering plus one or two field change requests that enhanced constructability. When it got to handover\, an Independent Safety Assessor asked for evidence that the identified mitigations – all of them – had actually been implemented. The designers by then had moved on to other projects so there was a furious flurry of activity followed by the realisation that one of the value engineering changes had undone a hazard mitigation.  Could this be done better? Could we manage mitigations from identification through to implementation using a known and proven technique. \nPresenter: Steve Dennehy  \nSteve Dennehy worked in South Africa on radar systems and self-protection systems for military platforms\, mainly aircraft\, for around 20 years\, firstly as a digital designer but gradually moved up through product design to systems engineering. The opportunity arose to work on the Square Kilometer Array (SKA) telescope\, initially as systems engineer on the signal processor and later on the SKA infrastructure in South Africa.  Steve moved to Auckland\, New Zealand in 2017 to work on the City Rail Link project as requirements manager. He joined Aurecon in mid-2019 as a systems engineer working in the rail sector. Steve’s particular areas of interest is requirements management\, within the context of systems engineering. \nOffered as a webinar.  Click on the link below to register
URL:https://www.rtsa.com.au/events/rtsa-nz-chapter-event-webinar-symbiosis-between-safety-and-requirements-management-on-the-auckland-city-rail-link-project-on-the-city-rail-link-project/
LOCATION:Queensland
CATEGORIES:New Zealand Events
ORGANIZER;CN="Railway Technical Society of Australasia":MAILTO:memberservices@engineersaustralia.org.au
END:VEVENT
END:VCALENDAR