BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.18.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Pacific/Auckland
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20190406T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20190928T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20200404T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20200926T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20210403T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20210925T140000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Pacific/Auckland:20200818T123000
DTEND;TZID=Pacific/Auckland:20200818T133000
DTSTAMP:20200731T010053Z
CREATED:20200731T005901Z
LAST-MODIFIED:20200731T010053Z
UID:2414-1597753800-1597757400@www.rtsa.com.au
SUMMARY:RTSA NZ Chapter Event (Webinar): Bridge 229 NIMT Replacement - Design and Construction
DESCRIPTION:Bridge 229 NIMT has been for some time the only bridge structure supported on timber piers in the Upper North Island region of the North Island Main Trunk (NIMT). For KiwiRail it is a major milestone to replace the timber piers and steel plate girder structure which is at the end of its service life with a with a new bridge structure. \nReplacement of Bridge 229 has not only addressed a maintenance prone timber substructure\, but has allowed KiwiRail to upgrade the vertical load carrying capacity from 18T to 25T axle loading and upgrade a direct fix deck structure to a ballasted deck for ease of track maintenance. \nIn an joint presentation the design and construction team will provide an insight into the conceptual and detailed design of the replacement bridge and the on-line construction of the replacement bridge with collaboration between designer and constructor being a key factor in the successful project outcome\, involving a 36 hour Block of Line in which the new post-tensioned trough deck was slid into place. The presentation will highlight the key constraints of on-line bridge replacement and provide examples of how these constraints were addressed during the design and construction phase of Bridge 229 NIMT. \nSpeakers: \nRonald Wessel is an Associate Bridge Engineer at Beca Limited with New Zealand and UK Chartered Engineer qualifications and 15 years of experience in civil engineering structures including extensive involvement in post seismic rail bridge repairs within NCTIR and rail bridge replacements across the North Island. \nAdam Buckland is an Engineer at Fulton Hogan with a Bachelor degree in Civil Engineering and has worked in the construction industry for 10years in largely structural projects\, including the Waterview Connection tunnel and the Christchurch Rebuild. \nClick on the link below to register (link will be shared once you have registered): \n \n 
URL:https://www.rtsa.com.au/events/rtsa-nz-chapter-event-webinar-bridge-229-nimt-replacement-design-and-construction/
LOCATION:Queensland
CATEGORIES:New Zealand Events
END:VEVENT
END:VCALENDAR