BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.18.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Melbourne
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20200404T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20201003T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20210403T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20211002T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20220402T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20221001T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Melbourne:20210325T183000
DTEND;TZID=Australia/Melbourne:20210325T203000
DTSTAMP:20210310T084901Z
CREATED:20210310T080008Z
LAST-MODIFIED:20210310T084901Z
UID:3009-1616697000-1616704200@www.rtsa.com.au
SUMMARY:NSW EA Event - Sydney Metro Stage 2 – Tunnelling for City Stations and Under the Harbour
DESCRIPTION:John Holland is a major contractor for Stage 2 of the Sydney Metro project\, the biggest public transport project in Australia. It comprises twin 15.5km tunnels from Chatswood to Sydenham as well as a number of stations. This talk will focus on the tunnel excavation and boring and the lining work for both the rail tunnels and the city stations including some of the techniques and challenges of tunnelling under the harbour. The city stations present particular problems due to the need to clear existing infrastructure and integration with the existing rail network. \n \n  \n  \n  \n  \n  \n  \n  \nSpeaker: Donald Reid \nAfter starting his career as a carpenter working in Seattle\, he was able to complete a degree in Economics in 1997 at the University of Washington. He subsequently studied Engineering at the same university graduating in 2010. He then joined McMillan Jacobs\, a consultancy specialising in underground engineering. In 2014 Donald moved back to Sydney with McMillan Jacobs and worked on the Sydney Westconnex projects as a design engineer. In 2018 he transferred to John Holland to work on the Sydney Metro\, where he was involved as an engineer working on the Martin Place Station. \n(This is not a RTSA event but an EA event.  Costs may be applicable.)
URL:https://www.rtsa.com.au/events/nsw-ea-event-sydney-metro-stage-2-tunnelling-for-city-stations-and-under-the-harbour/
LOCATION:Webex or in person at Mittagong RSL (with dinner option)
CATEGORIES:New South Wales and ACT Events
END:VEVENT
END:VCALENDAR