BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.18.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Pacific/Auckland
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20200404T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20200926T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20210403T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20210925T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20220402T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20220924T140000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Pacific/Auckland:20210614T123000
DTEND;TZID=Pacific/Auckland:20210614T133000
DTSTAMP:20210609T021141Z
CREATED:20210609T021141Z
LAST-MODIFIED:20210609T021141Z
UID:3242-1623673800-1623677400@www.rtsa.com.au
SUMMARY:NZ Chapter Event: Rebuilding Rail in post earthquake Christchurch - webinar
DESCRIPTION:Rebuilding Rail in Post EQ Christchurch – Waltham Scenic Journeys Servicing Centre\nJoin the RTSA NZ Chapter and KiwiRail online to hear about the challenges of redeveloping and replacing damaged rail mechanical facilities following the devastating 2011 Christchurch earthquakes. \nLearn from the project team involved in the design and construction of the Waltham Scenic Journeys Servicing Centre (SJSC) featuring a fully automated carriage wash facility for the TranzAlpine and Coastal Pacific fleets as part of the staged redevelopment of the Waltham Rail Yard in Christchurch. \nKiwiRail initiated the Christchurch Mechanical Redevelopment Programme following significant damage to assets after the 2011 Christchurch earthquakes. The damage was spread across multiple rail sites along the Main South Line that provided mechanical maintenance and servicing to KiwiRail’s fleet of South Island rolling stock. \nBackground\nWith help from Fraser Robson\, we will learn about the extent of damage to facilities\, other key drivers for change\, redevelopment priorities\, and achievements to date. \nDesign\nGlyn Moss from GHD will provide an insight into the design process and technical challenges faced by the design team of the Waltham SJSC. \nConstruction\nJosh Gordon will take us through the construction journey for the Waltham SJSC including use of clever technology to interrogate the design model to optimise construction sequencing. \nLessons Learnt\n –Michael Wright will then share a summary of key Lessons Learnt from the Waltham SJSC that KiwiRail and the project team have developed from a review of project successes and challenges so that these can be applied to future KiwiRail projects. \nQ&A with the project team will follow : \n\nFraser Robson\, Senior Project Manager\, Frequency\nGlyn Moss\, Senior Technical Advisor\, GHD\nJosh Gordon\, Contracts Manager\, HRS Construction\nBruce Hall\, Director\, Transport Wash Systems Ltd (TWS)\nMichael Wright\, Senior Project Manager\, Frequency\n\n\nClick here to register!
URL:https://www.rtsa.com.au/events/nz-chapter-event-rebuilding-rail-in-post-earthquake-christchurch-webinar/
LOCATION:Queensland
CATEGORIES:Events,New Zealand Events
ORGANIZER;CN="RTSA New Zealand Chapter":MAILTO:tech.groups@engineeringnz.org
END:VEVENT
END:VCALENDAR