BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.18.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Pacific/Auckland
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20200404T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20200926T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20210403T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20210925T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20220402T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20220924T140000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Pacific/Auckland:20210715T123000
DTEND;TZID=Pacific/Auckland:20210715T133000
DTSTAMP:20210712T043027Z
CREATED:20210708T022213Z
LAST-MODIFIED:20210712T043027Z
UID:3336-1626352200-1626355800@www.rtsa.com.au
SUMMARY:NZ Chapter Event: Reinforcement of the Wellington Electrified Area Webinar
DESCRIPTION:Join the RTSA New Zealand Chapter online for a presentation on the Need for Power – Reinforcement of the Wellington Electrified Area (WEA) Traction Electricity Supply\, Presented by Richard Catlow. \nThe Wellington Network is undergoing significant investment in renewals and upgrades\, part of the Wellington Metro Upgrade Programme. Part of this Programme involves preparing the network for higher frequency and longer electric passenger metro trains. One of the infrastructure requirements for this is the need for more capacity in the traction power supply system\, resulting in the need for upgraded and additional substations across the network. This presentation will focus on the development of the substations project and its objectives\, with a special focus on the power modelling completed and the interpretation of the results\, which have identified a number of existing areas requiring improvement and the need for a number of additional traction substations. \nSpeakers\nRichard Catlow\, Director of Energy Systems at SNC-Lavelin\nMichael McKeon\, Project Director at Kiwi Rail\nKarl Strode-Penny\, Rail Operations Specialist at KSP Consulting Limited \nThe key speaker will be electrical engineer Richard Catlow\, with an introduction from Michael McKeon – Project Director at KiwiRail\, supported by Karl Strode-Penny who prepared the timetable models used to drive the power simulation\, and coordinated the power study for KiwiRail. Richard is a Director of Energy Systems at SNC-Lavalin in Canada and previously lived and worked in New Zealand and was intensively involved in the commissioning of the new Auckland metro railway electrification in the early 2010s. Karl is a consultant based in wellington who specialises in timetable and operations modelling and analysis. \nClick here register on the Engineering New Zealand website. \nReplacing the overhead electrical system image from KiwiRail: https://www.kiwirail.co.nz/what-we-do/projects/wellington/johnsonville-line/
URL:https://www.rtsa.com.au/events/nz-chapter-event-reinforcement-of-the-wellington-electrified-area/
LOCATION:Queensland
CATEGORIES:Events,New Zealand Events
ORGANIZER;CN="RTSA New Zealand Chapter":MAILTO:tech.groups@engineeringnz.org
END:VEVENT
END:VCALENDAR