BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.18.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Sydney
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20200404T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20201003T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20210403T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20211002T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20220402T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20221001T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20210816T103000
DTEND;TZID=Australia/Sydney:20210816T113000
DTSTAMP:20210804T042439Z
CREATED:20210804T042439Z
LAST-MODIFIED:20210804T042439Z
UID:3369-1629109800-1629113400@www.rtsa.com.au
SUMMARY:NZ Chapter Event: Working Stress- the New Zealand rail bridge rating story
DESCRIPTION:Join the RTSA New Zealand Chapter and Mike Keenan (KiwiRail) to hear about the history of how rail bridges in New Zealand are “rated”. This presentation is being held as an RTSA New Zealand online meeting. \nKiwiRail maintains a substantial rail infrastructure network of which its bridge stock are an essential component. These bridges have been developed over the 160 year life time of New Zealand’s railway and are a key enabler of the networks overall capacity. How these bridges are “rated” to determine their load carrying ability has likewise developed over time. This presentation will describe the background to choices made\, the influence of other overseas railways\, how the rating is now done and some of the challenges that the network faces. \nMike Keenan is part of the team responsible for engineering oversight of KiwiRail’s structures assets. He has been working on inspection\, maintenance and renewal of the rail network in New Zealand for the past 15 years. \nClick here register on the Engineering New Zealand website.
URL:https://www.rtsa.com.au/events/nz-chapter-event-working-stress-the-new-zealand-rail-bridge-rating-story/
LOCATION:Queensland
CATEGORIES:Events,New Zealand Events
ORGANIZER;CN="RTSA New Zealand Chapter":MAILTO:tech.groups@engineeringnz.org
END:VEVENT
END:VCALENDAR