BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.18.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Adelaide
BEGIN:STANDARD
TZOFFSETFROM:+1030
TZOFFSETTO:+0930
TZNAME:ACST
DTSTART:20200404T163000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0930
TZOFFSETTO:+1030
TZNAME:ACDT
DTSTART:20201003T163000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1030
TZOFFSETTO:+0930
TZNAME:ACST
DTSTART:20210403T163000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0930
TZOFFSETTO:+1030
TZNAME:ACDT
DTSTART:20211002T163000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1030
TZOFFSETTO:+0930
TZNAME:ACST
DTSTART:20220402T163000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0930
TZOFFSETTO:+1030
TZNAME:ACDT
DTSTART:20221001T163000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Adelaide:20210902T163000
DTEND;TZID=Australia/Adelaide:20210902T180000
DTSTAMP:20210830T063911Z
CREATED:20210830T063737Z
LAST-MODIFIED:20210830T063911Z
UID:3408-1630600200-1630605600@www.rtsa.com.au
SUMMARY:SA Event: Local joint RTSA and IRSE Meeting
DESCRIPTION:The Railway Technical Society of Australasia (RTSA) South Australia Chapter invites you to join them and the Institution of Railway Signalling Engineers (IRSE) for a local joint meeting  online using Teams at 4:30-6:00pm (ACST). \nProgramme \n\n4:30pm Meeting Opening – Georgina Hartwell\, IRSE Australasian Chair\n4:35pm Lessons from Derailment Investigations\nTony Simes\, Senior Transport Safety Investigator\, ATSB\n5:15pm Phoenix Virtualisation and Disaster Recovery project – Network Control Centres\nDoug Adams\, Manager Operational Technology Project Services – ARTC\n6:00pm Meeting Conclusion\n\n  \nRegister to attend here. \n  \nSpeakers\nLessons from Derailment Investigations \nThe presentation discusses the safety investigations into two similar derailments that occurred about two years apart. Tony will discuss what happened\, why it happened and what lessons organisations can learn from derailment investigations. \n \nTony Simes\nManager Rail Safety Investigations – ATSB\nTony has 35 years’ experience in railway engineering\, management\, regulation and investigation\, and holds a Bachelor of Engineering (Electrical) and a Diploma of Transport Safety Investigation. \nTony previously held the position of ‘Signal Design Engineer’ for the metropolitan passenger railway organisation in Adelaide (SA) before moving to the Rail Safety Regulator in South Australia as their ‘Accreditation Manager’. \nIn 2004\, Tony joined the Australian Transport Safety Bureau as a ‘Senior Transport Safety Investigator’ (Rail) and in 2012 took on the role of managing and coordinating rail safety investigations across Australia. \nIn 2017\, the ATSB underwent a restructure which created multi-modal investigation teams. Tony\ncurrently manages a team of investigators split between ATSB’s Adelaide and Perth offices. The team consists of rail\, marine\, aviation and specialist human factors. \n  \nPhoenix Virtualisation and Disaster Recovery project – Network Control\nCentres Business objectives and outcomes \n\nTo recover our existing operational systems in the agreed timeframes in the event of a disaster.\nDeliver a virtualised/replicated environment\, that allows recoverability of our Operational Systems\, and for them to be run independently of the location of any of our train control centres\n\nWho is involved? \n\nThe project involves many stakeholders including as key suppliers\, operations\, customers\, various SMEs from ARTC’s Systems and Technology division\n\nSystem virtualisation platform \n\nARTC has chosen Flexpod as the system virtualisation platform. FlexPod is a data center platform that is used to host infrastructure software and business applications in virtualised environments.\n\nSecurity model \n\nCyber security is at the forefront of the platform design. This includes operational environment protection from other zones\, restricting\nan attacker’s ability to move within operational systems if the perimeter has been breached\, and physical security.\n\nDisaster and failover scenarios accommodated by the design \n\nNetwork Control floor is evacuated however\, the Data Centre and systems are operational. (e.g. pandemic)\nA disaster has occurred and both Network Control and the Data Centre are non-operational\n\n \nDoug Adams\nManager Operational Technology Project Services – ARTC\nEmployed in the rail industry for over 30 years\, commencing as an apprentice Signal Electrician with PTC in 1979\, then worked as Signal Technician and Signal Supervisor. Is a graduate of CSU with a Bachelor of Information Technology and started with ARTC in 2004 to rollout IT Infrastructure for the NSW take-up. \nHas overseen delivery of ARTC capital works signalling projects as Signal Alliance Coordinating Manager and as Train Control Systems Manager\, has overseen the support teams responsible for ARTC’s Train Control and other operational systems.\nIs continuing the development of technical solutions and strategies for ARTC’s Operational Technology with the Systems and Technology division. \n  \nRegister to attend here.
URL:https://www.rtsa.com.au/events/sa-event-local-joint-rtsa-and-irse-meeting/
LOCATION:Queensland
CATEGORIES:Events,South Australia Events
ORGANIZER;CN="Railway Technical Society of Australasia":MAILTO:memberservices@engineersaustralia.org.au
END:VEVENT
END:VCALENDAR