BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.18.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Pacific/Auckland
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20200404T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20200926T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20210403T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20210925T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20220402T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20220924T140000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Pacific/Auckland:20210914T123000
DTEND;TZID=Pacific/Auckland:20210914T133000
DTSTAMP:20210909T022801Z
CREATED:20210909T022801Z
LAST-MODIFIED:20210909T022801Z
UID:3422-1631622600-1631626200@www.rtsa.com.au
SUMMARY:NZ Chapter Event: Remote monitoring and the Kaikoura earthquake recovery webinar
DESCRIPTION:Join the Railway Technical Society of Australasia and Daniel Headifen online at 12:30-1:30pm (NZST) on the 14th September\, to hear about how remote monitoring and operational controls were used in the reopening of the Main North Line following the Kaikoura Earthquake and then contributed to improving its ongoing resilience. Register here. \nThe 2016 Kaikoura Earthquake severely damaged and put out of use the Main North Line railway and State Highway 1 in the upper areas of the South Island.  There was immense pressure to open the transport corridor as quickly as possible whilst minimising the risk from the main earthquake-generated landslides. While it became clear that the MNL railway could be opened quicker than the road\, to do so in a safe manner would require the running of trains under a different operational framework than prior to the earthquake. This presentation details the operational controls used with particularly attention paid to how remote monitoring was utilised as well as  weather monitoring and Trigger Action Response Plans. \nDaniel is a Programme Director for KiwiRail’s Capital Project’s team. Following the 2016 Kaikoura Earthquake he was seconded from KiwiRail into the North Canterbury Transport Infrastructure Recovery (NCTIR) alliance. For the first year he was part of the NCTIR alliance management team responsible for rail design aspects of the recovery and coordination between KiwiRail and NCTIR. Subsequently he was the rail Asset Owner representative within NCTIR. \nClick here register on the Engineering New Zealand website.
URL:https://www.rtsa.com.au/events/nz-chapter-event-remote-monitoring-and-the-kaikoura-earthquake-recovery-webinar/
LOCATION:Queensland
CATEGORIES:Events,New Zealand Events
ORGANIZER;CN="RTSA New Zealand Chapter":MAILTO:tech.groups@engineeringnz.org
END:VEVENT
END:VCALENDAR