BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.18.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Pacific/Auckland
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20200404T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20200926T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20210403T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20210925T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20220402T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20220924T140000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Pacific/Auckland:20211005T123000
DTEND;TZID=Pacific/Auckland:20211005T133000
DTSTAMP:20210930T043159Z
CREATED:20210930T042424Z
LAST-MODIFIED:20210930T043159Z
UID:3444-1633437000-1633440600@www.rtsa.com.au
SUMMARY:NZ Chapter Event: Design and Construction of the KiwiRail Tar Barrel Tunnel Bypass\, Main North Line
DESCRIPTION:Join the Railway Technical Society of Australasia New Zealand Chapter online for a presentation on the design and construction of the KiwiRail Tar Barrel tunnel bypass\, Main North Line by Rob Hunter\, and Gilles Langlais at 12:30-1:30pm NZDT on Tuesday 5th October 2021. \nRegister here. \nDeterioration of Tunnel 21 had been documented back to as early as the 1970’s\, and following the 2016 Kaikoura and Seddon Earthquakes\, suffered more damage.  With a low resilience to future earthquakes and general deterioration of the concrete lining\, coupled with tight clearances\, track subgrade and formation in poor condition\, and a TSR of 15km/hr\, a new rail alignment was proposed.  This presentation details how the project team managed to accelerate the design and tender process\, provides an overview of construction and some of the key challenges that were faced\, and summaries a few of the key lessons learned. \nSpeakers\nRob Hunter\, Project Manager at Tonkin & Taylor \nRob is a Project Manager and Engineer for Tonkin & Taylor.  In mid-2018 he helped to establish the project team and assisted in the project\, design and tender management through to mid-2019.  He then provided client-side project management throughout the construction phase alongside roles in monitoring\, surveillance and quality assurance\, and contract management. \nGilles Langlais\, Project Manager at HEB Construction \nGilles is a Project Manager for HEB Construction. He joined the TBTB project in August 2019 as a Structures Project Engineer where he helped to deliver the new Ruakanakana underpass structure. In mid-2020\, Gilles moved into a Project Manager role and helped with delivering the remainder of the road and rail works through to completion. \nClick here register on the Engineering New Zealand website.
URL:https://www.rtsa.com.au/events/nz-chapter-event-design-and-construction-of-the-kiwirail-tar-barrel-tunnel-bypass-main-north-line/
LOCATION:Queensland
CATEGORIES:Events,New Zealand Events
ORGANIZER;CN="RTSA New Zealand Chapter":MAILTO:tech.groups@engineeringnz.org
END:VEVENT
END:VCALENDAR