BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.17.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Sydney
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20250405T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20251004T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20260404T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20261003T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20270403T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20271002T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Sydney:20260901T173000
DTEND;TZID=Australia/Sydney:20260901T190000
DTSTAMP:20260810T014654Z
CREATED:20260810T014654Z
LAST-MODIFIED:20260810T014654Z
UID:11161-1788283800-1788289200@www.rtsa.com.au
SUMMARY:Simplifying ETCS level 2 integration
DESCRIPTION:Join the RTSA NSW Chapter online and in-person at Engineers Australia Sydney for a presentation on simplifying ETCS level 2 integration. \n📅  6.00 – 7.00 pm (AEST) Tuesday 1st September \n🌏  Online and in-person in Sydney \n🎟️  Register on the Engineers Australia website: Simplifying ETCS level 2 integration | Engineers Australia \nOverview\nFor rail operators\, deploying advanced technologies such as European Train Control System (ETCS) L2 and traffic management systems represents both a major change and a significant challenge. In many instances these transformation projects involve the integration of unfamiliar COTS products into existing systems. At the same time operators are faced with the need to avoid disruption by trying to minimise the impact the new systems will have on their operational procedures. Based on project experience\, this presentation outlines an interface management approach that has successfully de-risked the deployment of ETCS L2 and enabled its integration into an existing railway. The presentation will guide you through the 12 steps of successful interface management and how the process can be supported with the use of Model-Based Systems Engineering. \nLearning outcomes\nIn this presentation\, you will understand: \n\nthe steps taken to identify and implement interfaces for successful ETCS L2 deployment\nthe tools and methods used to manage interfaces\nlessons we’ve learnt and risks we mitigated.\n\nProgram\nIn-person: \n\n5.30 pm AEST: Registration opens\n6.00 pm AEST: Event begins\n7.00 pm AEST: Event concludes\n\nOnline: \n\n6.00 pm AEST: Event begins\n7.00 pm AEST: Event concludes\n\nAbout the speaker\n\n\n\nNico Teulier\nPrincipal Consultant Systems Engineering and Executive Director – Acmena
URL:https://www.rtsa.com.au/events/simplifying-etcs-level-2-integration/
LOCATION:Engineers Australia Sydney (Market Street)\, 44 Market Street Mezzanine Level\, Sydney\, New South Wales\, 2000\, Australia
CATEGORIES:Events,New South Wales and ACT Events
ATTACH;FMTTYPE=image/png:https://www.rtsa.com.au/wp-content/uploads/2025/04/Chapter-logo-NSW.png
END:VEVENT
END:VCALENDAR