BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.16.5.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Melbourne
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20220402T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20221001T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20230401T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20230930T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20240406T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20241005T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VTIMEZONE
TZID:Pacific/Auckland
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20220402T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20220924T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20230401T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20230923T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20240406T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20240928T140000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Melbourne:20230518T170000
DTEND;TZID=Australia/Melbourne:20230518T180000
DTSTAMP:20230501T062259Z
CREATED:20230501T062042Z
LAST-MODIFIED:20230501T062259Z
UID:4431-1684429200-1684432800@www.rtsa.com.au
SUMMARY:On-Line Event: From big data to building the first autonomous train
DESCRIPTION:Overview\nRio Tinto’s autonomous train is 2.4km long\, consists of three locomotives and carries around 28\,000 tonnes of iron ore\, it travels over 280km. It’s the world’s first fully autonomous\, long distance\, heavy-haul rail network. The trains are giant autonomous robots because once they are set on their course\, they make all the decisions. \nThe AutoHaul™ team monitor the trains remotely from the Operations Centre in Perth (over 1\,500km away)\, they set the route and once the train is running the on-board computers and the computers in the Operations Centre take over and control the train. From setting the speed\, to avoiding collisions\, checking for obstructions at crossings and verifying there are no faults\, damage or broken couplings. \nLearn more about the innovation behind this world-first technology. \n \nAbout the speaker\nLido Costa\, MIEAust CPEng NER APEC Engineer IntPE(Aus)\, Lead Technical Engineer\, Rio Tinto \nLido was the Lead Technical Engineer on the AutoHaul® Driverless Trains system. Lido was part of the project delivery leadership team responsible for all technical aspects of the system. As Technical Authority\, Lido was accountable for approving technical changes to the AutoHaul® system. This role represented the most senior level of engineering oversight for the AutoHaul® system\, on behalf of RTIO\, including approving of System Hardware and Software Architecture and Safety Assurance strategy. Lido has over 35 years’ experience in Railway Signalling\, Communications and Control Systems with leading roles in projects in Europe (such as the Madrid – Seville High Speed Line)\, Asia\, Africa and Australia. Lido is a Chartered Professional Engineer (Aus) and a Fellow of the Institute for Railway Signalling Engineers (FIRSE) UK. \n  \nTo register\, click on the link below.
URL:https://www.rtsa.com.au/events/on-line-event-from-big-data-to-building-the-first-autonomous-train/
CATEGORIES:Events,New South Wales and ACT Events,New Zealand Events,Queensland Events,South Australia Events,Victoria and Tasmania Events,Western Australia Events
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Pacific/Auckland:20230525T123000
DTEND;TZID=Pacific/Auckland:20230525T133000
DTSTAMP:20230505T041442Z
CREATED:20230505T041442Z
LAST-MODIFIED:20230505T041442Z
UID:4448-1685017800-1685021400@www.rtsa.com.au
SUMMARY:NZ Chapter Event (online): Level Crossings Removal Project - Learnings from Melbourne
DESCRIPTION:Overview\nIn this online event\, Jamie Green (Major Projects Director at WSP) will share an overview of Southern Program Alliance that is delivering the Melbourne’s Level Crossings Removal Project and talk about how it has developed over the last five years. He will cover how the Alliance model has enabled the team to evolve and to increase efficiency and value for money for the state of Victoria and the travelling public. \nStarting with why we should remove level crossings\, Jamie will cover a brief history of what Melbourne has achieved to date. He will also examine the high-level decision making and key considerations that are applied to each crossing. He will then cover the Alliance itself: the benefits of the model\, what it has achieved\, and an overview of each work package. \nClick here to register for this online event!
URL:https://www.rtsa.com.au/events/nz-chapter-event-online-level-crossings-removal-project-learnings-from-melbourne/
CATEGORIES:Events,New Zealand Events
ORGANIZER;CN="RTSA New Zealand Chapter":MAILTO:tech.groups@engineeringnz.org
END:VEVENT
END:VCALENDAR