BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.16.5.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Pacific/Auckland
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20220402T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20220924T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20230401T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20230923T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20240406T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20240928T140000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Pacific/Auckland:20231212T173000
DTEND;TZID=Pacific/Auckland:20231212T193000
DTSTAMP:20231127T214846Z
CREATED:20231127T214846Z
LAST-MODIFIED:20231127T214846Z
UID:4842-1702402200-1702409400@www.rtsa.com.au
SUMMARY:NZ Chapter Event: Year end event
DESCRIPTION:Join the RTSA NZ Chapter for their end of year event – New Train Control Centre & KiwiRail Engineering Team at 5:30-7:30 pm Tuesday 12th December in person in Auckland\, Wellington and Christchurch\, or online. \nPlease join us for our end of year get together\, including a presentation on the new Rail Operations Centre in Wallaceville as well as a presentation from KiwiRail’s Network Engineering team on their goals for the future. \nThe event will be broadcasted across parallel sites in Wellington\, Auckland and Christchurch with members and guests welcome to attend in any of these locations for networking with some drinks and nibbles before and after the presentations. The event will also be broadcast as a webinar for those not able to attend in person. \nFor those attending the Wellington venue please note that the dinks and nibbles after the presentation will be hosted at an additional venue\, details for this to come. \nEvent Details\n5:30 – 7:30pm \nTuesday 12th December \nAuckland: Beca Offices\, 21 Pitt Street\, Auckland CBD\nWellington: Engineering New Zealand\, Level 6\, 40 Taranaki Street\, Wellington ( Post Presentation Drinks & Nibbles Venue: TBC)\nChristchurch: Beca Offices\, ANZ Centre\, Level 2\, 267 High Street\, CBD\nOnline: Via Zoom (6pm start) \nAbout the Speakers\nNew Rail Operations Centre – KiwiRail’s National Train Control\, which controls train movements across most of the country\, moved into new premises in Wallaceville\, Upper Hutt earlier this year. The new control centre in Upper Hutt watches over every railway track from Invercargill to Whangārei\, bar the Auckland commuter network which has its own separate centre. The 2800m2 facility is staffed by more than 100 people and is located at the Blue Mountains Campus in Wallaceville. The facility tracks and monitors each line around the country in real time\, giving the operational team the ability to direct traffic or negotiate track obstructions as quickly as possible. Carl Mills’ talk will cover both the performance aspects of the new facility as well as how it was designed and constructed and particularly how its operation was transferred over from the previous facility. \nKiwiRail Network Engineering Team – The Engineering Team is a diverse team that delivers many different functions across all the disciplines that deliver rail infrastructure\, including signals\, telecommunications\, traction\, electrical\, track\, structures and civil. Included in its functions are developing and maintaining technical standards and policies\, engineering technical advice and in-house design and design management services as well as a wide variety of other services. Christina Hawke’s presentation will cover off both aspects of these works but also the Network Engineering teams recent developments and its goals for the future. \nCarl Mills – has worked in the rail industry since 1994 in the New Zealand in a variety of roles including Regulatory Relationship Manager and national Manager of Network Operations. Currently he is Project Director – Control Systems Integration responsible for upgrading KiwiRail’s control systems and facilities\, including the construction and commissioning of the new Wallaceville centre. \nChristina Hawk – is originally from Hawaii having also spent time working in California before moving to New Zealand in 2019. She joined KiwiRail in early 2022 as the Engineering Civil Sector Manager. In this role she is responsible for the line management of KiwiRail professional engineering team responsible for business as usual\, renewals and improvements for civil\, track and structures infrastructure. \nRegistration Information\nClick here to register on the Engineering New Zealand website.
URL:https://www.rtsa.com.au/events/nz-chapter-event-year-end-event/
CATEGORIES:Events,New Zealand Events
ORGANIZER;CN="RTSA New Zealand Chapter":MAILTO:tech.groups@engineeringnz.org
END:VEVENT
END:VCALENDAR