BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.16.5.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Pacific/Auckland
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20210403T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20210925T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20220402T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20220924T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20230401T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20230923T140000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Pacific/Auckland:20220929T123000
DTEND;TZID=Pacific/Auckland:20220929T133000
DTSTAMP:20220919T011824Z
CREATED:20220919T011049Z
LAST-MODIFIED:20220919T011824Z
UID:4121-1664454600-1664458200@www.rtsa.com.au
SUMMARY:NZ Chapter event: City Rail Link Contract 9 - Britomart East
DESCRIPTION:Join the RTSA NZ Chapter online at 12:30-1:30pm NZDT on the 29th September to hear about City Rail Link (CRL) Contract 9 (Britomart East). This project reconfigures the underground junction at the east end of Britomart Station (to be renamed Waitemata Station when City Rail Link opens). It includes upgrade from ballast to slab track to match the CRL tunnels\, rail systems and structural modifications to match. This is a critical piece of work to ensure that CRL can achieve full capacity. Being in a very constrained site with limited access and challenging operational conditions\, it is being designed and constructed in multiple stages over several years. It is approximately half built\, and detailed design of the final stage is nearing completion. This presentation will give an overview of the design objectives\, development\, and staging\, as well as the construction to date. \nClick here to register. \nSpeaker\nThis presentation will be delivered by Tim Smith (Design Package Manager for Aurecon)\, with Jaco Vorster (Engineering Manager\, Martinus Rail) \nTim Smith is an Associate in Rail and Mass Transit at Aurecon. He has been the Design Package Manager for Britomart East right from the initial investigation through to detailed design. He also helped manage and lead the alignment designs for several wider network projects including Mt Eden Single Line Enabling works\, Otahuhu 3rd Main and the Strand crossover. He is the alignment subject matter expert for CRL Owner Verifier. He also brings international experience from the Trackwork Services Alliance with KBR in Sydney. \nJaco is the Engineering Manager for Martinus New Zealand. He has been involved in various aspects of CRL’s ballasted and ballastless trackform design and construction packages. Jaco brings practical application and an understanding of integrated systems to lead Martinus New Zealand’s systems assurance for design & engineering teams. He worked on various international multidisciplinary rail projects in Australia\, the USA\, Europe and Africa. \nAn opportunity for Q&A with the team will follow the presentation.
URL:https://www.rtsa.com.au/events/nz-chapter-event-city-rail-link-contract-9-britomart-east/
CATEGORIES:Events,New Zealand Events
ORGANIZER;CN="RTSA New Zealand Chapter":MAILTO:tech.groups@engineeringnz.org
END:VEVENT
END:VCALENDAR