BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.16.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Pacific/Auckland
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20180331T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20180929T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20190406T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20190928T140000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1300
TZOFFSETTO:+1200
TZNAME:NZST
DTSTART:20200404T140000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1200
TZOFFSETTO:+1300
TZNAME:NZDT
DTSTART:20200926T140000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Pacific/Auckland:20190731T173000
DTEND;TZID=Pacific/Auckland:20190731T183000
DTSTAMP:20260618T220842
CREATED:20190719T124400Z
LAST-MODIFIED:20190719T124508Z
UID:1517-1564594200-1564597800@www.rtsa.com.au
SUMMARY:RTSA - NZ Chapter Event and Webinar - Cleaning the Otira Tunnel
DESCRIPTION:Cleaning the Otira Tunnel \nThe RTSA NZ invite you to an encore of the above presentation in Wellington on Wednesday 31 July\, which will also be available to view as a live webinar. \n\n\n\n\n\n\n\n\n\n\nNeil Mason\, Managing Director of Vitruvius Ltd\, has kindly agreed to make an encore performance of his fascinating presentation on cleaning the Otira Rail Tunnel\, originally given to the RTSA in April\, so that a wider New Zealand and international audience can participate. \nSituated on the Midland Line between Otira and Arthurs Pass in the South Island\, KiwiRail’s Otira rail Tunnel measures an impressive 8.566 km in length and runs through a harsh but fragile alpine environment. At the time of its opening in 1923 it was the longest tunnel in the southern hemisphere. \n\n\n\n\n\n\n\n\n\n\nFor the past 30 years the tunnel has conveyed trains carrying uncovered coal wagons up the steep 1 in 33 gradient from Otira\, combined with the ventilation system has deposited sand and coal dust on the floor and walls creating a “mountain range” balanced along the top of power and communication cables. A creative method had to be developed\, using innovative technology\, to remove the deposits by water jets and then remove the particulates from the water to comply with stringent environmental consent conditions\, before discharge into the nearby river. \nNeil has led many interesting and challenging rail projects through his 27 years in the rail industry in NZ and the UK. As Project Manager for KiwiRail for the Otira Tunnel project\, he successfully led the complex design\, challenging consenting phase and testing physical works delivery.  Neil was recently quoted saying “cleaning the Otira Tunnel has been without doubt the toughest project I have ever done.  It could only have been made harder if we were asked to deliver the scope wearing blindfolds” \nWednesday\, 31 July\, 5.30pm (NZ time)\nEngineering New Zealand\, L6\, 40 Taranaki Street\, Wellington\nRegister here \nThere will be an opportunity for networking with drinks and nibbles provided from 5pm. \nThe presentation will also be broadcast as a live webinar for those unable to attend in Wellington\, to take part in the online webinar\, please register here.
URL:https://www.rtsa.com.au/events/rtsa-nz-chapter-and-webinar-cleaning-the-otira-tunnel/
LOCATION:Engineering New Zealand\, 40 Taranaki Street\, Wellington\, New Zealand
CATEGORIES:Events,New South Wales and ACT Events,New Zealand Events,Queensland Events,South Australia Events,Victoria and Tasmania Events,Western Australia Events
ORGANIZER;CN="RTSA New Zealand Chapter":MAILTO:tech.groups@engineeringnz.org
END:VEVENT
END:VCALENDAR