BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.17.3.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Sydney
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20220402T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20221001T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20230401T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20230930T160000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1100
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20240406T160000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+1000
TZOFFSETTO:+1100
TZNAME:AEDT
DTSTART:20241005T160000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20231020
DTEND;VALUE=DATE:20231021
DTSTAMP:20231003T053018Z
CREATED:20231003T052457Z
LAST-MODIFIED:20231003T053018Z
UID:4720-1697760000-1697846399@www.rtsa.com.au
SUMMARY:WA Chapter Event: METRONET Morley-Ellenbrook Line site visit
DESCRIPTION:RTSA WA Chapter members\, please join us on a site visit to the METRONET Morley-Ellenbrook Line. \nThis site visit will be dedicated to an in-depth examination of rail operational aspects\, the feasibility of construction approaches and the incorporation of cutting-edge construction technologies. \nThe speaker at this event is Robert Keenan\, Project Lead\, Rail Operations WA. \nPlease note: there are two separate visits for this event (Professionals with an RIW card and Students). Please use the approporiate registration link below to secure your spot. This event is free to attend. \nOverview\nThe METRONET Morley-Ellenbrook Line\, spanning 21 km\, stands as Perth’s most substantial public transportation initiative since the inception of the Mandurah Line. This progressive addition effectively extends the burgeoning rail transport network of Perth to cater to its north-eastern suburbs. \nEncompassing the initiative are five novel stations\, various structures such as bridges and underpasses\, the incorporation of two dive structures\, elevated rail and seamless integration with Tonkin Highway\, a key thoroughfare in Perth known for its persistent traffic congestion. \nThis site visit to the METRONET Morley-Ellenbrook Line will be dedicated to an in-depth examination of rail operational aspects\, the feasibility of construction approaches and the incorporation of cutting-edge construction technologies. \nWe request for participants to be a minimum Rail Industry worker supervised worker inducted (RIW number must be provided to enter the site tour). \nLearning outcomes\nParticipants will gain a deeper understanding of: \n\nconstruction in the rail industry\nproject management in a multidisciplinary environment\nthe latest rail technology\n\nAbout the speaker\n \nRobert Keenan \nProject Lead\, Rail Operations WA \nRob is a highly qualified rail construction professional with over 26 years of experience in the rail industry. Having spent eight years of his career in Europe’s high-pressure transportation industry\, he is accustomed to delivering results in live rail environments both safely and on time. Rob has worked on a number of large-scale and complex rail projects and has extensive experience on various rail networks. His relevant project experience includes the $50m Rio Tinto Track Renewals Mega Shutdown and the $955m Sydney Central Station Main Works project. Rob is experienced in key leadership positions in collaborative contracting infrastructure rail projects of a similar nature\, both in Australia and the UK. His alliance project experience includes multiple interfacing contractors/alliances\, providing him with a strong understanding of the importance of collaboration and coordination and what is required to ensure successful outcomes for all parties. Rob’s technical knowledge and experience in delivering possession-driven projects have been beneficial in leading the team to success. \n  \nSite visit details\nLocation\nMELconnx Project Office Corner of Beringarra Avenue and Metal Circuit Malaga\, Perth\, Western Australia\, 6090 \n  \nProfessionals (RIW required)\nDate: Friday\, 20 October 2023 \nTime: 9:00am – 12:00pm AWST \nVenue: MELconnx Project Office Cnr of Beringarra Avenue and Metal Circuit Malaga\, Perth \nProfessionals Registration: Site visit: Morley-Ellenbrook (Professionals) \n  \nStudents\nDate: Friday\, 20 October 2023 \nTime: 1:00pm – 4:00pm AWST \nVenue: MELconnx Project Office Cnr of Beringarra Avenue and Metal Circuit Malaga\, Perth \nStudents Registration: Site visit: Morley-Ellenbrook (Students)
URL:https://www.rtsa.com.au/events/wa-chapter-event-metronet-morley-ellenbrook-line-site-visit/
LOCATION:Engineers Australia Sydney (Market Street)\, 44 Market Street Mezzanine Level\, Sydney\, New South Wales\, 2000\, Australia
CATEGORIES:Events,Western Australia Events
ORGANIZER;CN="Railway Technical Society of Australasia":MAILTO:memberservices@engineersaustralia.org.au
END:VEVENT
END:VCALENDAR