BEGIN:VCALENDAR
VERSION:2.0
PRODID:-// - ECPv6.18.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.rtsa.com.au
X-WR-CALDESC:Events for 
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Australia/Adelaide
BEGIN:STANDARD
TZOFFSETFROM:+1030
TZOFFSETTO:+0930
TZNAME:ACST
DTSTART:20210403T163000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0930
TZOFFSETTO:+1030
TZNAME:ACDT
DTSTART:20211002T163000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1030
TZOFFSETTO:+0930
TZNAME:ACST
DTSTART:20220402T163000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0930
TZOFFSETTO:+1030
TZNAME:ACDT
DTSTART:20221001T163000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+1030
TZOFFSETTO:+0930
TZNAME:ACST
DTSTART:20230401T163000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0930
TZOFFSETTO:+1030
TZNAME:ACDT
DTSTART:20230930T163000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VTIMEZONE
TZID:Australia/Brisbane
BEGIN:STANDARD
TZOFFSETFROM:+1000
TZOFFSETTO:+1000
TZNAME:AEST
DTSTART:20210101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VTIMEZONE
TZID:Australia/Perth
BEGIN:STANDARD
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
TZNAME:AWST
DTSTART:20210101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Australia/Adelaide:20220712T173000
DTEND;TZID=Australia/Adelaide:20220712T200000
DTSTAMP:20220627T044751Z
CREATED:20220627T044546Z
LAST-MODIFIED:20220627T044751Z
UID:3883-1657647000-1657656000@www.rtsa.com.au
SUMMARY:Qld Chapter Event: HS2: Managing a Design Team of 2000 - Opportunities and Challenges
DESCRIPTION:Join the RTSA and the Institution of Civil Engineers – Queensland Local Association\, for an evening presentation on the UK’s High Speed 2 (HS2) project. \nHS2 is Europe’s largest infrastructure project. Over the coming years\, a new high-speed line will be designed and built from London to the North-West of England\, with HS2 trains then linking through to the biggest cities in Scotland. The scale of the undertaking means that upward of 2000 people are involved in the project day to day\, presenting a unique opportunity\, as well as a few challenges\, to deliver a truly once in a generation transformational outcome. \nThis presentation will provide an overview of: \n\nThe High Speed 2 project generally\, its purpose and desired outcomes\nThe scale and composition of the team engaged to design and deliver the project\nThe opportunities and challenges\n\nEvent Program: \n\n5:30PM Registration\, networking & catering\n6:00PM Presentation & Q&A session\n7:00PM Networking & beverage service\n8:00PM Event Conclusion\n\nSpeaker: \nJol Bates\, Global Transport Sector Lead\, Mott MacDonald
URL:https://www.rtsa.com.au/events/qld-chapter-event-hs2-managing-a-design-team-of-2000-opportunities-and-challenges/
LOCATION:Engineers Australia Queensland Level 9\, 340 Adelaide Street Brisbane \, Queensland \, 4000\, Engineers Australia Queensland Level 9\, 340 Adelaide Street\, Brisbane\, Queensland\, 4000\, Australia
CATEGORIES:Events,Queensland Events
ORGANIZER;CN="Railway Technical Society of Australasia":MAILTO:memberservices@engineersaustralia.org.au
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Adelaide:20220718T173000
DTEND;TZID=Australia/Adelaide:20220718T193000
DTSTAMP:20220705T070425Z
CREATED:20220704T001927Z
LAST-MODIFIED:20220705T070425Z
UID:3917-1658165400-1658172600@www.rtsa.com.au
SUMMARY:Vic Chapter Event: HS2: Managing a Design Team of 2000 - Opportunities and Challenges
DESCRIPTION:Join the RTSA Vic Chapter for an evening presentation on the UK’s High Speed 2 (HS2) project. \nHS2 is Europe’s largest infrastructure project. Over the coming years\, a new high-speed line will be designed and built from London to the North-West of England\, with HS2 trains then linking through to the biggest cities in Scotland. The scale of the undertaking means that upward of 2000 people are involved in the project day to day\, presenting a unique opportunity\, as well as a few challenges\, to deliver a truly once in a generation transformational outcome. \nThis presentation will provide an overview of: \n\nThe High Speed 2 project generally\, its purpose and desired outcomes\nThe scale and composition of the team engaged to design and deliver the project\nThe opportunities and challenges\n\nEvent Program: \n\n5:30PM Registration\, networking & catering\n6:00PM Presentation & Q&A session\n7:00PM Networking & beverage service\n8:00PM Event Conclusion\n\nSpeaker: \nJol Bates\, Global Transport Sector Lead\, Mott MacDonald \n \nJol Bates leads Mott MacDonald’s global transportation team with a dominant focus in rail working with a range of clients from Asia\, Australasia\, Europe\, and North America. He joined Mott MacDonald in 2008 and since his appointment\, Jol has strengthen the management and railway engineering capability with a particular focus on multidisciplinary major projects\, high speed rail\, rail infrastructure maintenance and light rail business improvement \n 
URL:https://www.rtsa.com.au/events/vic-chapter-event-hs2-managing-a-design-team-of-2000-opportunities-and-challenges/
LOCATION:Engineers Australia Melbourne\, Level 26/ 181 William Street\, Melbourne\, Victoria\, 3000\, Australia
CATEGORIES:Events,Victoria and Tasmania Events
ORGANIZER;CN="Railway Technical Society of Australasia":MAILTO:memberservices@engineersaustralia.org.au
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20220720T170000
DTEND;TZID=Australia/Brisbane:20220720T190000
DTSTAMP:20220701T070609Z
CREATED:20220619T113247Z
LAST-MODIFIED:20220701T070609Z
UID:3849-1658336400-1658343600@www.rtsa.com.au
SUMMARY:Qld Chapter Event: Strategic Rail Planning
DESCRIPTION:Strategic rail planning can be defined as providing evidence-based advice to inform and influence key rail planning decisions during the early up-front rail project development and product definition phases. In this presentation\, Julien Morizet will share his personal experience on strategic rail planning\, based on projects he contributed to in Australia and internationally\, aiming to deliver optimal customer experience. Participants will hear some “lessons learnt” that may apply to future developments of Australia’s rail network. \nThe presentation will be followed by catering and a networking session\, providing guests the opportunity to expand their professional networks and connect with like-minded individuals. \nEvent program \n\n5:00pm — Arrival & registration\n5:15pm — Presentation commencement\n5:45pm — Networking drinks & canapes\n7:00pm — Conclusion\n\nSpeaker: Julien Morizet CPeng\, Senior Principal Rail Operations Planning Consultant\, WSP Australia \nJulien Morizet’s international experience covers the whole lifecycle of rail operations\, including strategic planning\, timetables design\, and operations management in passenger and freight rail transport. Before moving to Australia\, Julien held engineering\, planning and operational roles in major railway companies in Switzerland\, The Netherlands and France. Julien is now based in Brisbane and is involved in various Australian and New Zealand rail projects.
URL:https://www.rtsa.com.au/events/qld-chapter-event-strategic-rail-planning/
LOCATION:WSP Queensland\, 900 Ann Street\, Fortitude Valley\, Queensland\, 4006\, Australia
CATEGORIES:Events,Queensland Events
ORGANIZER;CN="Railway Technical Society of Australasia":MAILTO:memberservices@engineersaustralia.org.au
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Perth:20220721T143000
DTEND;TZID=Australia/Perth:20220721T153000
DTSTAMP:20220712T090714Z
CREATED:20220624T020801Z
LAST-MODIFIED:20220712T090714Z
UID:3864-1658413800-1658417400@www.rtsa.com.au
SUMMARY:WA Event: The real value of rail safety
DESCRIPTION:This presentation will provide a timely reminder as to why the physical and mental safety of themselves and those around them should be a top priority\, that safety has a real value and that engineers must consider safety as their highest priority. The speakers will share their own experiences that have led to their advocacy and provision of safety. The rail industry is under pressure to build increasingly complex and challenging projects under significant resource constraints. In this environment\, the temptation to cut corners in the interest of “getting the job done” can be great. \nSpeakers: \nBen Broadbridge\, Founder of Beyond All Bounds and Mental Health First Aid Master Instructor \nBen is a speaker\, master facilitator and advocate for social change in the area of mental health and wellbeing. Through engaging storytelling and relatable\, humanist approach to his delivery\, Ben aims to leave people with memorable interactions that inspire and inform. Using a blend of compassion\, realness and evidence-based techniques\, Ben’s focus is helping people better understand and support those in their lives that may be struggling. \nShane Haley\, Linesman\, Elite Overhead Wiring Solutions \nShane has 16 years experience in OLE working for various organisations in Western Australia. An incident at Nowergup yard when working near live equipment caused him to suffer an electrical shock\, and led to him spending 10 days in hospital with significant burns to his body. \nTo register and for further details click on the link below
URL:https://www.rtsa.com.au/events/wa-event-the-real-value-of-rail-safety/
LOCATION:Engineers Australia WA Auditorium\, 712 Murray St\, Perth\, WA\, 6005\, Australia
CATEGORIES:Events,Western Australia Events
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=Australia/Brisbane:20220728T173000
DTEND;TZID=Australia/Brisbane:20220728T193000
DTSTAMP:20220719T044147Z
CREATED:20220714T085937Z
LAST-MODIFIED:20220719T044147Z
UID:3935-1659029400-1659036600@www.rtsa.com.au
SUMMARY:Qld Chapter Event: Design approvals on major projects
DESCRIPTION:Join the RTSA Queensland Chapter in Brisbane at 5:30-7:30pm on Thursday 28th July for a presentation followed by an informal networking event. Hatch will share their recent experience working on major Infrastructure projects and the challenges faced in the design approval process. \nTopics of discussion will be successful engagement with project stakeholders\, including asset owners\, construction teams\, operators\, and external parties and how they are key in the delivery of these projects. \nClick here to register on the Engineers Australia website. \nEvent program\n\n5:30pm: Registration & Networking\n6:00pm: Presentation\n7:00pm: Networking\n7:30pm: Event concludes\n\nEvent Speakers\n \nEvan Slattery\nSenior Rail Engineer\, Hatch \nEvan is a Senior Rail Engineer and Design Manager with the Hatch Rail Team in Brisbane. He holds an Associate Degree of Civil Engineering and Diploma of CAD from Southbank Institute of Technology and is currently completing a bachelor’s degree at Queensland University of Technology. His most recent experience on Cross River Rail saw him lead the team as Design Manager for the Tunnels Stations and Developments\, Southern Area package through to final Detailed Design. Evan has since transitioned into his current role as Rail Construction Services Lead providing the key interface between the construction and design teams in the highly constrained and complex brownfield rail corridor. \n  \n \nMaricela Riddoch P. Eng. MIEAust CPEng NER\nSouthern Region Highways Lead\, Hatc \nExperienced Sessional Lecturer with a demonstrated history of working in the higher education industry. Skilled in Project Management\, Land Development\, Water Resources\, Sewer\, Water\, utility works and mentoring. \nMaricela has a bachelor’s degree focused on Civil Engineering from Lakehead University. \n  \n \nSteve Wilson FIEAust CPEng NER\nMajor Projects Director\, Hatch \nSteve is an RPEQ-qualified Chartered Civil Engineer and Fellow of Engineers Australia with 24 years’ domestic and international experience in the planning and delivery of large-scale infrastructure projects. I have led multiple major transport projects in roles both client-side and within D&C delivery teams.\nRecently I have held roles as Design Manager for the Cross River Rail CBD station precincts\, Design Director for TMR’s Rocky Creek Bridge Replacement\, and Senior Technical Manager delivering WestConnex Stage 2 (M8) in Sydney. \n  \n \nGeorge Tilley\nSenior Rail Engineer\, Hatch \nGeorge is an Engineer with more than 12 years’ experience of permanent way design in the rail consulting industry in the UK and Australia. He has worked on a range of projects varying in size\, complexity and multidisciplinary integration specialising in track alignment and geometry. Recent project experience includes track alignment lead for Cross River Rail TSD\, Inland Rail\, City Rail Link and Carmichael Rail.
URL:https://www.rtsa.com.au/events/qld-chapter-event-design-approvals-on-major-projects-28th-july/
LOCATION:Level 1 Petrie Terrace\, Brisbane\, Queensland Australia\, Level 1\, 61 Petrie Terrace\, Brisbane\, Queensland\, 4000
CATEGORIES:Events,Queensland Events
ORGANIZER;CN="Railway Technical Society of Australasia":MAILTO:memberservices@engineersaustralia.org.au
END:VEVENT
END:VCALENDAR